ADVANTAGE

 

APHORISM

PROJECT: ADVanced communicAtions and iNformaTion processing in smArt Grid sysTEms

 

PROJECT: Advanced Procedures for volcanic and Seismic Monitoring

CODE: FP7-ICT-607774

 

DURATION: 01/01/2013 - 30/11/2016

DURATION: 01/01/2014 - 31/12/2017

 

CODE: FP7-SPACE-2013-1

PROJECT: MANAGER Jesús Alonso-Zárate, Ph.D.

 

PROJECT MANAGER: Michele Crosetto, Ph.D.

BUDGET: 714.694 euros

 

BUDGET: 290.872 euros

FUNDING: European Commission

 

FUNDING: European Commission

     

COMBO

 

STRAUSS

PROJECT: Convergence of fixed and Mobile BrOadband access/aggregation networks

 

PROJECT: Scalable and efficienT oRchestrAtion of Ethernet services Using Software-defined and flexible optical networkS

CODE: FP7-ICT-317762

 

CODE: FP7-ICT-317999

DURATION: 01/01/2013 - 30/06/2016

 

DURATION: 01/06/2013 - 31/05/2016

PROJECT MANAGER: Ricardo Martínez, Ph.D.

 

PROJECT MANAGER: Raül Muñóz, Ph.D.

BUDGET: 290.872 euros

 

BUDGET: 352.710 euros

FUNDING: European Commission

 

FUNDING: European Commission

     

COPCAMPS

 

AUDITOR

PROJECT: COgnitive & Perceptive CAMeraS

 

PROJECT: Advanced Multi-Constellation EGNSS Augmentation and Monitoring Network and its Application in Precision Agriculture

 

CODE: ARTEMIS 332913

 

CODE: H2020-Galileo-2015-1-687367

DURATION: 01/04/2013 - 31/03/2016

 

DURATION: 01/01/2016 – 31/12/2017

PROJECT MANAGER: Christos Verikoukis, Ph.D.

 

PROJECT MANAGER: Carles Fernández, Ph.D.

BUDGET: 175.500 euros

 

BUDGET: 188.625 euros

FUNDING: European Commission

 

FUNDING: European Commission

     

IOSENSE

 

IRACON

PROJECT: Flexible FE/BE Sensor Pilot Line for the Internet of Everything

 

PROJECT: Inclusive Radio Communication Networks for 5G and beyond

CODE: H2020-ECSEL-692480

 

CODE: CA15104 Action

DURATION: 01/04/2016 – 31/03/2019

 

DURATION: 22/03/2016 – 21/03/2020

PROJECT MANAGER: Christos Verikoukis, Ph.D.

 

PROJECT MANAGER: Carles Antón-Haro Ph.D.

BUDGET: 419.850 euros

 

BUDGET: 16.000 euros

FUNDING: European Commission

 

FUNDING: European Commission

     

SCAVENGE

 

P2P-SMARTEST

PROJECT: Sustainable CellulAr networks harVEstiNG ambient Energy

 

PROJECT: Peer to Peer Smart Energy Distribution Networks

DURATION: 01/02/2016 – 31/01/2020

 

CODE: H2020-LCE-2014-3-646469

CODE: H2020-MSCA-ITN-2015

 

DURATION: 01/04/2015 - 31/03/2018

PROJECT MANAGER: Paolo Dini, Ph.D.

 

PROJECT MANAGER: Carles Fernández, Ph.D.

BUDGET: 743.618 euros

 

BUDGET: 333.441

FUNDING: European Commission

 

FUNDING: European Commission

     

SANSA

 

TIMON

PROJECT: Shared Access Terrestrial-Satellite Backhaul Network enabled by Smart Antennas

 

PROJECT: Enhanced real time services for optimized multimodal mobility relying on cooperative networks and open data

CODE: H2020-ICT-2014-1 645047

 

CODE: H2020-MG-2014-636220

DURATION: 01/01/2015 - 31/01/2018

 

DURATION: 01/06/2015 - 31/11/2018

PROJECT MANAGER: Ana Pérez-Neira, Ph.D.

 

PROJECT MANAGER: Javier Arribas, Ph.D.

BUDGET: 550.335 euros

 

BUDGET: 500.087 euros

FUNDING: European Commission

 

FUNDING: European Commission

     

5g-crosshaul

 

FANTASTIC-5G

PROJECT: 5g-crosshaul: The 5G Integrated fronthaul/backhaul

 

PROJECT: Flexible Air iNTerfAce for Scalable service delivery wiThin wIreless Communication networks of the 5th Generation -

CODE: H2020-ICT-2014-2 / 671598

 

CODE: H2020-ICT-2014-2 / 671660

DURATION: 01/07/2015 - 31/12/2017

 

DURATION: 01/07/2015 - 31/06/2017

PROJECT MANAGER: Josep Mangues, Ph.D.

 

PROJECT MANAGER: Mònica Navarro, Ph.D.

BUDGET: 367.222 Euro

 

BUDGET: 407.000 Euro

FUNDING: European Commission

 

FUNDING: European Commission

     

Flex5Gware

 

iREACT

PROJECT: Efficient Hardware/Software and Platforms for 5G Network Elements and Devices

 

PROJECT: Inkjet-Printed Wireless Powered Circuits for Sensing and Identification puf

CODE: H2020-ICT-2014-2 / 671563

 

CODE: H2020-MSCA-IF-2014 7 661621

DURATION: 01/07/2015 - 31/06/2017

 

DURATION: 01/02/2015 - 28/02/2019

PROJECT MANAGER: Miquel Payaró, Ph.D.

 

PROJECT MANAGER: Pepe Rubio, Ph.D.

BUDGET: 476.000 Euro

 

BUDGET: 257.191 Euro

FUNDING: European Commission

 

FUNDING: European Commission

     

SIW-SAT-ANTENNAS

 

SAFETY

PROJECT: Circularly Polarized Antenna Arrays for Broadband Satellite Data Terminals Using Substrate Integrated Waveguides enhanced with Metamaterials

 

PROJECT: Sentinel for geohazard regional monitoring and forecasting

 

CODE: H2020-MSCA-IF-2014

 

CODE: ECHO/SUB/2015718679/PREV02

DURATION: 16/06/2015 - 16/06/2017

 

DURATION: 01/01/2016-31/12/2017

PROJECT MANAGER: Christos Kalialakis, Ph.D.

 

PROJECT MANAGER: Oriol Monserrat, Ph.D.

BUDGET: 170.121 Euros

 

BUDGET: 183.902 Euros

FUNDING: European Commission

 

FUNDING: European Commission

     

 

­